Kirby Rd (Pedestrian Improvements)
from Old Chesterbrook Rd to Hasley Rd, Mclean, VA.
Relocate Existing Watermain in order to install storm drain improvements
Improve existing storm drainage system along with Filterra Tree Box structure at Kirby Rd infront of Old Chesterbrook Elementary school.
Excavation & preparations to install concrete sidewalk, curb & gutter, handicap ramps & concrete aprons for asphalt driveways.
Backfill, Stabilize & Restore all disturbed areas with topsoil, seed & matting.
Asphalt paving of residential driveways & resurfacing of roadway, project completion.
.